Open Nav

Rail

Bond Street

Client:Costain Skanska Joint Venture

Main Contractor:Crossrail

Bond Street crossrail station is helping to improve accessibility and increase capacity to one of the busiest shopping districts in the UK.

LMOB were brought in to supply, install, test and commission the electrical installation inclusive of the following services throughout both the East and West tickets halls and shafts areas and the platforms and tunnels:

  • Installation of full Containment Management systems inclusive of all bracketry design
  • Secondary containment to lighting and Power
  • Installation of all Lighting, Lighting Control and Emergency Lighting systems
  • Installation of all LV Distribution Equipment
  • Supply and Installation of all LV Power
  • Supply and Installation of all Earthing and Bonding throughout
  • Electrical Safe Systems of Work for the LV Systems

Farringdon Station

Client:Crossrail

Main Contractor:NG Bailey

Peak Manpower:40

Project completion:September 2020

Farringdon station is set to be one of the busiest in the UK, connecting with Thameslink and the London Underground to provide links with outer London, the home counties, the City, Canary Wharf and three of three of London's five airports.

LMOB were commissioned to undertake the entirety of the Electrical Installation within the East and West tickets halls on the project which included the installation, testing, commissioning, setting to work and training others in the operation and maintenance of:

  • LV Distribution
  • Lighting
  • Emergency Lighting
  • DALI Lighting control wiring
  • Small Power
  • Cable Management systems
  • Earthing and Bonding

Accreditations

Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner